I’ve searched but can’t find an answer.
As I’m replacing the OS driveshaft I thought I’d change the ball joint.
2002 172 Phase 2 needs the m12 bolted version, right till now?
On removing the old one it quickly became obvious the stud that goes into the hub was about 15mm on the old one and 18mm on the new one.
Any ideas, as the ECP / GSF websites aren’t sufficiently detailed to give all dimensions.
As I’m replacing the OS driveshaft I thought I’d change the ball joint.
2002 172 Phase 2 needs the m12 bolted version, right till now?
On removing the old one it quickly became obvious the stud that goes into the hub was about 15mm on the old one and 18mm on the new one.
Any ideas, as the ECP / GSF websites aren’t sufficiently detailed to give all dimensions.